 |
 |
 |
 |
| |
 |

Replace Air Handling Units in MER#2, DC VA Medical Center
Partnered with JTS Construction, Tuckman-Barbee will install ten custom air handling units and controls, while maintaining critical HVAC service throughout the facility.
Linear Accelerator Suite, Baltimore VA Medical Center
Tuckman-Barbee, alongside JTS Construction, will install a new linear accelerator shell and 10,000 SF suite for the Veterans Administration.
Prince George’s African-American Museum and Cultural Center
Interior renovations of 4,000 SF of office and display areas, including a new roof and mechanical system.
HVAC Upgrades at Washington center for Aging Services
This project will replace 52 PTAC units, two FCUs, and two primary RTUs for the facility.
Install High Pressure Gas Lines, United States Naval Academy
Tuckman-Barbee will coordinate the installation of HP gas lines throughout the campus, including a valve room and multiple tie-ins and meters at various facilities.
London Town Garden and Visitor Center
This Anne Arundel County Government project involves the interior renovation of a historic visitor center on the South River. Numerous displays and artwork will be installed.
Repair Hill and Fitch Bridges, United States Naval Academy
Deferred maintenance of two bridges, including topside and below water repairs.
ATFP Upgrades at Marine Corps Reserve Center, Baltimore
This design-build project will provide site improvements, including security fencing, access control gates, parking lots, and concrete walks.
|
 |
| |
 |
 |
 |
|